SMV Calculator

Calculate Standard Minute Value accurately for garment manufacturing. Professional time study tool for production planning, efficiency analysis, and costing.

Time Study Parameters

Sewing
Cutting
Finishing
Assembly
Pressing
Packing
Hours
Minutes
Seconds
100%
50% 100% 150%
Personal %
Fatigue %
Delay %
Special %

SMV Results

Awaiting Input
Basic Time
0.00 minutes
Rated Time
0.00 minutes
SMV
0.00 minutes
Production Time
0.00 hours
Efficiency Analysis
Enter time study parameters and click Calculate to get efficiency analysis and recommendations.

Calculation Details

Operation Type
Sewing
Performance Rating
100%
Total Allowances
15.0%
Production Quantity
1,000 pieces
SMV Calculation Formula
SMV = (Observed Time × Performance Rating%) × (1 + Total Allowances%)

SMV Breakdown

Detailed breakdown of Standard Minute Value components.

Component Value Percentage Description
Basic Time 0.00 min 0.0% Observed time without allowances
Personal Allowance 0.00 min 0.0% Personal needs and relaxation
Fatigue Allowance 0.00 min 0.0% Recovery from work fatigue
Delay Allowance 0.00 min 0.0% Unavoidable delays and interruptions
Special Allowance 0.00 min 0.0% Machine or process specific allowances
Total SMV 0.00 min 100.0% Standard Minute Value for operation