SMV Calculator
Calculate Standard Minute Value accurately for garment manufacturing. Professional time study tool for production planning, efficiency analysis, and costing.
Time Study Parameters
Sewing
Cutting
Finishing
Assembly
Pressing
Packing
Hours
Minutes
Seconds
Personal %
Fatigue %
Delay %
Special %
SMV Results
Awaiting Input
Basic Time
0.00 minutes
Rated Time
0.00 minutes
SMV
0.00 minutes
Production Time
0.00 hours
Efficiency Analysis
Enter time study parameters and click Calculate to get efficiency analysis and recommendations.
Calculation Details
Operation Type
Sewing
Performance Rating
100%
Total Allowances
15.0%
Production Quantity
1,000 pieces
SMV Calculation Formula
SMV = (Observed Time × Performance Rating%) × (1 + Total Allowances%)
SMV Breakdown
Detailed breakdown of Standard Minute Value components.
| Component | Value | Percentage | Description |
|---|---|---|---|
| Basic Time | 0.00 min | 0.0% | Observed time without allowances |
| Personal Allowance | 0.00 min | 0.0% | Personal needs and relaxation |
| Fatigue Allowance | 0.00 min | 0.0% | Recovery from work fatigue |
| Delay Allowance | 0.00 min | 0.0% | Unavoidable delays and interruptions |
| Special Allowance | 0.00 min | 0.0% | Machine or process specific allowances |
| Total SMV | 0.00 min | 100.0% | Standard Minute Value for operation |